Solar Rooftop Installation Project - S K Cycle Co., Ltd.

Sook Solar Energy successfully completed the installation of a 120.85 kWp On-Grid (3-Phase) solar power system for S K Cycle Co., Ltd. The system is installed on the factory rooftop to optimize energy consumption during daytime operations, when electricity demand is at its peak.
⚙️ System Overview
The system is carefully designed to match the factory’s energy usage profile, enabling maximum utilization of solar energy and reducing dependency on grid electricity.
It is equipped with a real-time monitoring system, allowing continuous tracking of energy production and system performance with high accuracy.












